Course Update

  Irrigation The first of the sprinklers heads are now installed with the 9 th green and 10 th tees fully fitted with heads and valves. Work has now moved onto the 8 th green followed by the 9 th tees and 10 th green. 12 th green After many weeks of dressing and rolling the 12 th green will be back in play for the weekend. Their will be a few ...
Continue reading
110 Hits
0 Comments

Course Update

 Irrigation - This week irrigation works have concentrated on the three holes in the far field (8th, 9th and 10 th ) Work included digging out the locations of the valve boxes and installing the pipework ready for green and tee installations. From these boxes irrigation pipe will be mole ploughed around the greens and tees ready for sprinkler ...
Continue reading
154 Hits
0 Comments

Course Update

  Irrigation Weather has been favourable allowing the installation all the 90mm and 63mm pipe work (ring main) to be completed ahead of schedule. Work will now start in the installation of the irrigation heads and pipework on the greens and tees. Taking advantage of the dry conditions and as the far field can be the wettest field, the contract...
Continue reading
154 Hits
0 Comments

Course Update

Strong winds last weekend took out another large bough, this time on one of the Willow trees behind the 6 th green. Willow trees can be prone to loosing limbs in strong winds as they become top heavy when they mature. Unfortunately the break has left a gaping hole when viewed from the green, but in time the Willow will regenerate and plug the gap. ...
Continue reading
167 Hits
0 Comments

Course Update

Last Sunday afternoon two very large limbs broke off the beautiful Horse Chestnut tree on the 9 th hole. The limbs fell during the day with no obvious reasons why, but thankfully no one was hurt when they fell. The greenstaff got to work first thing Monday morning and had the limbs cut up and removed from site within a few hours. I have reviewed th...
Continue reading
176 Hits
0 Comments

Course Update

Irrigation Irrigation works has continued well this week with all the 90mm mains pipe installed. The spoil on top of the trenches will be cleared and areas made good.  Work will now turn to mole ploughing the smaller 63mm pipes which will connect to the greens, tees and approach valve boxes.  Mole ploughing is achieved by pulling the pipe...
Continue reading
230 Hits
0 Comments

Irrigation Update

The irrigation project is progressing very well with over 1500 metres of mains pipework installed already. The 90mm pipe that members can see laying around the course will be trenched into the ground, this process does create more spoil but is a much quicker process. Later in the installation a smaller 63mm pipe will be mole ploughed which should m...
Continue reading
181 Hits
0 Comments

Irrigation

As reported last week the new irrigation ring main was marked out on Tuesday, including the location of the valve boxes. Victor Jamieson (designer) and Ashley Proctor (contractor) were both present to plot a route around the course avoiding major obstacles such as large tree roots and major services. Phase one will be the mole ploughing of the ring...
Continue reading
209 Hits
0 Comments

Course News

Levelling of the 1 st medal tee is now complete taking just over one day to complete. The tee will now be regularly top dressed and watered to help the turf establish so we can get it back into play as soon as possible. ​ Removing the turf  Once levelled the turf is laid Job completed This time of year disease is rife due to drop in night time...
Continue reading
126 Hits
0 Comments